top of page

Real Estate

Due Diligence.

从收购前的瑞丰乐投letou尽职调查到帮助优先考虑资本支出和最小化运营成本的服务, Nova is a trusted partner throughout the total ownership cycle. 进行环境评估,以确定与现场和非现场活动有关的潜在环境状况. A phased approach allows the client to maximize information obtained while minimizing costs. 物业状况评估(PCA)通常用于评估建筑系统的剩余使用寿命. By doing so, Nova can assist its clients with preserving capital expenditures, while at the same time extending the useful life of critical building components and systems.

Nova's Expertise

Nova现场专业人员和团队领导在为私人客户进行和管理环境现场评估(ESA)方面拥有丰富的经验, banks, and government agencies all over the country. Nova员工经过培训,可以根据ASTM E1527-13进行或审查I期调查, the EPA’s All Appropriate Inquiry (AAI), Freddie Mac, Fannie Mae DUS, and HUD guidelines or specific lender requirements. Projects range from vacant land to industrial manufacturing, brownfield sites, petroleum facilities, oil/gas properties, and telecommunications sites. Nova’s staff has a strong understanding of facility operating systems, state and federal regulations, and fate and transport of chemicals through air, soil, surface water, and groundwater.  Additionally, Nova has staff trained in specific areas of expertise who are available to consult as needed.

Services.

Icon-1-new-inv-lighter-3.jpg

Environmental Site Assessments

进行环境现场评估(ESA),以确定与现场和非现场活动有关的潜在环境问题. A phased approach allows clients to maximize information obtained while minimizing costs.

 

Nova begins with routine research and on-site reconnaissance.  随后的调查阶段进一步确定关注的领域并评估纠正措施.

Typical ESA activities include...

  • 审查与现场和周边地区有关的地形/地质/水文地质信息

  • Review of historical land use activities at the site

  • Review of regulatory information

  • Site reconnaissance

  • Surrounding property observation

然后将这些资料汇编成一份报告,总结调查结果并概述有关环境利益或关注项目的建议.

 

Many clients require scopes of work specifically tailored to meet their needs. Nova员工熟悉ASTM E1527-13一期环境评估的具体要求, Fannie Mae and Freddie Mac, Real Estate Investment Trusts (REIT), and HUD, as well as other lender-specific requirements.

  • Lead-Based Paint

  • Asbestos

  • Historic Preservation

  • Floodplain Management

  • Wetlands Protection

  • Endangered Species

  • Noise Analysis

  • Explosive/Flammable Hazards/Hazardous Industrial Operations

  • Sole Source Aquifers

  • Airport Clear Zones

  • Additional Hazards and Nuisances (covers, pipelines, etc.)

  • Wild and Scenic Rivers/Unique Natural Features

  • Environmental Justice

  • Soil Stability, Erosion and Drainage

  • Zoning

  • Water Supply/Sanitary Sewers and Solid Waste Disposal

  • Schools/Parks/Social Services

  • Emergency Health Care, Fire and Police Services

  • Commercial/Retail and Transportation

  • Water Quality/Clean Water Act

  • Vapor Intrusion

Contact

Ray Hutchison | Senior Vice President, New York, NY

Email | 201-391-0520

Icon-1-new-inv-lighter-3.jpg

Phase II Subsurface Investigations

在确定与给定财产的现场和非现场活动相关的环境问题后, Nova经常建议进行地下调查,以进一步评估已确定的环境问题对地下土壤的影响, soil vapor, and/or groundwater and any resulting risks to human health or the environment.  所有调查均按照适用的当地法规要求进行.

Nova's Expertise

Nova’s technical staff includes on-site, project managers, 专业地质学家和工程师,在执行瑞丰乐投letou尽职调查和现场重建调查方面具有丰富的经验.

然后将这些资料汇编成一份报告,总结调查结果并概述有关环境利益或关注项目的建议.

 

 

Health and Safety

Health and safety are always a concern, 因此,Nova在进行地下调查之前准备了一份现场健康和安全计划(SHSP). 安全安全计划确定健康和安全风险,并预先制定必要的应急程序和响应协议.

NG Drilling

Nova Group, GBC (NG Drilling), has provided subsurface soil, soil vapor, and groundwater sampling services to its clients on more than 500 project sites, using hydraulic direct-push probing/drilling applications. Nova采用轨道安装的6620 Geoprobe®和卡车安装的5400 Geoprobe®使用Macro-Core, dual tube, and auger drilling technologies. Nova’s equipment is used for soil and groundwater sampling, groundwater monitoring well installations, vapor point installations and sampling, sub-slab permanent vapor point installations, and pilot tests. Nova’s track-mounted unit offers unique capabilities, 包括在常规设备无法操作的通道有限或可用空间有限的地区的专门机动性.

  • Subsurface Drilling/Probing

  • Soil, Soil Vapor and Groundwater Sampling

  • Groundwater Monitoring Well Installations

  • Ground Water Modeling

  • Remedial Investigation

  • Regulatory Compliance Reporting

Contact

Mark Perry | Environmental Assessment & Remediation Group

Email | 612-275-1997

Icon-1-new-inv-lighter-3.jpg

Property Condition Assessments

Nova为全国众多抵押贷款和建筑贷款机构提供财产状况评估服务. Many projects involve Fannie Mae, Freddie Mac, HUD, and rating agency guidelines.  Services are provided for multifamily residential, commercial, hospitality, new construction, and industrial facilities.

Property Condition Assessment Services

Property Condition Assessments are often required as part of pre-purchase, owner-commissioned, or refinance transactions. Nova的服务包括实地考察,以评估物业的总体状况和维护历史,并评估结构的整体设计和施工.  All available on-site project and construction documentation is reviewed, and interviews with property managers, tenants, and local officials are conducted.

Nova的财产状况报告提供了关于所有场地和建筑改进的条件和充分性的叙述,并包括表格和信息, including items of deferred maintenance, estimates of immediate and annual replacement reserves, and comments on the buildings’ conformance with code, ADA, unfinished work, and FHA compliance.

Third-Party Review

Third-party review of reports, reserve tables, 进行其他财产评估,以通知客户现有报告的完整性和符合ASTM和贷方标准. Deficiencies are identified, and recommended solutions are provided.

Contact

Ray Hutchison | Senior Vice President, New York, NY

Email | 201-391-0520

Expanded Property Condition Assessment Services - For Equity Clients

When performing due diligence prior to acquisition, Nova is aware that buyers’ risk tolerance may vary. 其股权市场集团提供超出ASTM基准标准的扩展尽职调查服务. Within the Equity Markets Group, clients will find experienced architects, engineers, certified roof and building envelope professionals, and construction specialists who can provide expanded assessments of building structure, enclosure systems, internal operating, and life safety systems. Nova可以组建一个评估小组,以满足客户的期望,并提供足够的房产信息,以更好地了解收购风险. Nova报告有详细的照片记录,并包括可能的成本意见,以弥补所观察到的物理缺陷,并有助于在所有权期间分配资本.

Services

  • Expanded Equity Level Property Condition Assessment and Report

  • Seller Disclosure Property Condition Assessment Report

  • Structural Condition Assessment

  • Seismic Risk Assessment

  • Building Envelope (Roof and Exterior) Assessment

  • Parking Garage Assessment

  • Forensic Analysis and Remedial Design

  • Roof Replacement Design

  • Facade Consulting, Design and Construction Oversight

  • BOMA Area Measurements

  • ADA Compliance Audits

Contact

Doug Knight | Equity Group Director

Email | 614-704-8766

Icon-1-new-inv-lighter-3.jpg

Agency Small Loans

Nova内部的代理服务小额贷款司进行现场检查,以评估物业建筑物的一般状况和结构要素. Document reviews are also conducted to review planned capital expenditures. Nova针对小额余额贷款(SBLs)的实物风险报告(PRR)和针对小额抵押贷款(sml)的精简实物状况评估(Streamlined Physical Condition Assessment)符合相关的房地美(Freddie Mac)或房利美(Fannie Mae)指南,并提供了关于场地和建筑改进的条件和充分性的叙述, including the required forms and
information. Nova’s Environmental Screen also complies with Freddie Mac or Fannie Mae Guidelines. 进行交易筛选以确定现场活动的潜在环境问题(PECs), off-site activities, and compliance with federal, state, and local agencies.

Nova's Expertise

Nova’s team members have extensive experience performing and managing high quality, thorough, and timely reports. 我们的员工包括注册建筑师、专业工程师和施工专家. 诺瓦的身体评估员工对设施操作系统有深刻的理解, MEP systems, architectural finishes, structural systems, life safety systems, and ADA accessibility compliance. Nova’s ESA employees are trained in facility operating systems, federal, local, and state regulatory requirements, and transport of chemicals through air, soil, soil vapor, surface water, and groundwater. Additionally, Nova may consult with staff located nationwide when needed, who are specialists and leaders in their field.

Services

  • Freddie Mac Small Balance Loan (SBL) Physical Risk Report (Form 1104)

  • Freddie Mac Fast, Reliable, Easy Decision (FRED) Physical Risk Report (Form 1108) with Environmental Screen Plus Radon

  • 房利美精简了小型抵押贷款项目的身体状况评估和环境筛选

What is the Nova Small Balance Difference?

Freddie Mac SBL (Form 1104)

 

Nova创建了一个符合房地美标准的小额余额贷款物理风险和交易屏幕报告,总结了表格1104中确定的物理风险项目. The report evaluates items such as deferred maintenance, critical and priority repairs, operational repairs, and the capital needs over the term of the mortgage, all in one succinct summary. In addition, 在交易屏幕中确定的潜在环境问题(PECs)以及确定所需替换储备的财产的总体状况在摘要中进行了描述. This report allows clients to understand at a quick glance the findings of Form 1104.

Contact

Angela Scott | National Account Manager

Email | 214-236-9981

Ask Us.

Feel free to ask us about our full range of environmental products and services.

Call: 855-440-9393

Email: info@honforjapan.net

Icon-Contact2.jpg
Globe Icon 2.jpg
bottom of page